Menu
Industries

Automotive & Vehicle PCBs

A vehicle programme is decided between the first article and the series order: whether the part stays the same, and whether the record of how it was built can be produced. Hitech Circuits runs automotive boards under IATF 16949:2016, fabricated and assembled on one site.

  • IATF 16949:2016
  • Prototype to series
  • One lot record

Digital instrument cluster and centre display inside a modern vehicle cabin

Certified to

  • ISO 9001:2015
  • IATF 16949:2016
  • UL No. E354070
  • IPC-6012B & IPC-A-600H

Technical Specifications

Quality system
IATF 16949:2016 · ISO 9001:2015 · UL file E354070
Lead time
Fastest 1–3 days · standard 5–8 working days · expedited 2 working days
Order size
MOQ 1 pc · prototype lots 1–50 pieces · volume quoted from the data package
Scope
Bare board · component sourcing · SMT and DIP assembly · test · box build
Engineering review
DFM, DFA and DFT before the quotation is fixed
Traceability
One lot record covering fabrication and assembly
Confidentiality
NDA on request · factory visits by appointment
Payment
Bank transfer (T/T) · EXW Shenzhen or DDP

A board behind a windscreen, under a bonnet or inside a battery pack is approved as part of the vehicle, so the supplier is judged on two things long after the drawing is signed: whether the part stays the same, and whether the record of how it was built can be produced. Both are process questions, which is why they are what this page answers.

What automotive boards have to survive

Heat, current and vibration arrive together. A motor drive, a DC-DC converter or a battery management board runs hot and carries real current; a camera or radar front end has to hold a defined impedance while the cabin temperature swings; a lighting board has to move LED junction heat into the chassis instead of leaving it in the board. Each case pushes the design towards a different substrate, copper weight and finish, and that choice is settled with engineering before the stack-up is frozen. The published limits are on the capability page, because they are the same for every industry and do not need repeating page by page.

Where a programme starts

Most vehicle programmes arrive as a prototype lot before there is a series order: one to fifty boards, built on the production lines with the production inspection rather than on a separate sample line. That is also the cheapest way to find a footprint, clearance or test-access problem.

  • Prototype and pilot — MOQ 1 pc, fastest 1–3 days, and 2 working days expedited at a premium.
  • Series production — medium volume in 4–10 days, quoted from the data package for the actual quantity.
  • Assembly and box build — the populated board, harness and enclosure can leave as one part.

Once the first article is approved, the stack-up, finish and placement programme carry into volume, so the series order is not a second development project.

What engineering changes on the line

The faults that stop an automotive build are rarely electrical. They are a pad that cannot hold a fine-pitch part next to a heavy-copper bus, a connector orientation that will not wave solder, a part on the BOM that becomes obsolete between prototype and series, or a panel that wastes half its area because the assembly outline was drawn for a different board. DFM, DFA and DFT review look for those before quotation, and the reply comes from the engineer who priced the job.

On the line, the checks that matter are the ones that leave a record: SPI before placement, AOI on both sides after reflow, X-ray on hidden joints, first-article inspection against the CAD data, and 100 % electrical test before packing. BGA rework and re-balling are done in-house and re-checked by X-ray, so a reworked joint does not leave without an image.

Records, confidentiality and visits

Because fabrication and assembly share one plant, a single lot record covers the bare board, the material batch and the assembled unit without a supplier handover where responsibility changes hands. The certificates behind that record — IATF 16949:2016, ISO 9001:2015, ISO 13485:2016, ISO 14001, ISO 45001 and UL file E354070 — are scanned on the certifications page, and the inspection sequence is described on quality assurance.

Programmes that cannot share drawings openly can work under a mutual NDA from the first exchange, and a visit to the Shenzhen or Meizhou plant can be arranged around the processes the programme would use. Payment is by bank transfer (T/T), with goods quoted EXW Shenzhen or DDP.

Next step

Send the Gerber set, the BOM and pick-and-place file if assembly is included, the annual quantity and the target date; a complete package is quoted within 24 to 48 hours. Board families used in vehicle work have their own pages — heavy copper, high-frequency, rigid-flex and aluminium metal-core — and turnkey assembly covers the build after the board. Lighting sections are covered under LED lighting PCBs, the rest of the industries we serve are on the industries page, and a quote can be requested on the contact page.

Frequently Asked Questions

  • How does an automotive programme start before series production?

    With one board rather than a volume commitment. MOQ is 1 pc, prototype lots of 1 to 50 pieces run through the same SMT and DIP lines as the series order, and prototypes come back in 1 to 3 days. The first article is built and inspected before volume is quoted, so a design fault is found while the work is still a file.

  • How is change control handled between the prototype and the series order?

    The stack-up, finish and placement programme fixed at the first article are the ones that run in series. DFM, DFA and DFT review the data package before the quotation is fixed and are repeated when the customer issues a revision, so a change is a documented change rather than a silent re-quote.

  • Which quality system covers an automotive build?

    IATF 16949:2016 for automotive programmes, on top of the ISO 9001:2015 base system, with boards UL recognised under file E354070 and RoHS compliant. Certificate scans are published on the certifications page; the process limits sit on the capability page, because they are the same for every industry.

  • What is the delivery window for a prototype or a production order?

    Fastest 1 to 3 days for a prototype, 5 to 8 working days on the standard queue, 2 working days expedited at a premium, and 4 to 10 days for medium volume. The date is confirmed on the quotation for the actual stack-up, finish and quantity.

  • Can files be shared before a purchase order exists?

    Yes. A mutual NDA can be signed before the Gerber set and BOM are exchanged, and the Shenzhen and Meizhou plants are open to customer visits by appointment, so the lines that would run the programme can be seen first.

  • What are the payment and delivery terms?

    Payment is by bank transfer (T/T). Orders are quoted EXW Shenzhen, or DDP where the buyer prefers a delivered price; the quotation states the term and the payment schedule.

More in this section

Request a customer quote

Free engineering review and quote for PCB manufacturing, PCB assembly, component sourcing and box build.