Menu
PCB Assembly

PCB Assembly Services

Seven assembly services under one quality system — SMT and through-hole lines, express prototypes, volume PCBA, component sourcing, test and box build, all in Shenzhen.

SMT assembly line at Hitech Circuits in Shenzhen placing surface-mount components

Certified to

  • ISO 9001:2015
  • IATF 16949:2016
  • UL No. E354070
  • IPC-6012B & IPC-A-600H

In This Section

What the assembly floor covers

Hitech Circuits assembles printed circuit boards from single prototypes to volume production. Four SMT lines and three DIP lines run in the same plant as PCB fabrication, so component sourcing, board assembly, test and box build assembly stay inside one quality system — a fault found at functional test is traced back to the board, the part or the fit without another supplier in the loop.

Assembly processes

  • Reflow soldering — the standard surface-mount process: solder paste is printed through a stencil, components are placed and the board is reflowed.
  • Wave soldering — molten solder is pumped against the underside of the board to solder through-hole pins in a single pass.
  • Selective soldering — a nozzle applies solder to individual through-hole joints, which keeps heat-sensitive neighbouring parts out of a second full thermal cycle.
  • Hand insertion and soldering — still the right answer for odd-form parts, heavy connectors and rework.
  • Point-to-point wiring — hand-mounted and soldered wiring for repair and legacy assemblies.

Parts can be placed on one or both sides at 4 mil (0.1 mm) pitch, down to 01005 and 0201 chip packages. Every process, and the inspection attached to it, is described on the printed circuit board assembly services page.

Where fabrication, parts and assembly are being sourced from China as one order, the China PCB assembly page explains how the four stages are quoted and traced together, and what paperwork ships with the order.

Engineering review before the first article

The Gerber set, BOM, pick-and-place file and assembly drawing go through DFM, DFA and DFT review: panel and stencil design, component clearance, polarity, test-point access and the placement program. Problems that would stop the line — a missing footprint, a part on stop, a package too close to a connector — are raised before the first board is built. First-article inspection then signs off every feeder, nozzle and vision setting on the run.

Inspection, test and rework

StageWhat it catches
Solder paste inspection (SPI)Paste volume, bridging and missed deposits before placement
Automated optical inspection (AOI)Placement, polarity and solder defects after reflow
X-rayBGA, micro-BGA, QFN and other joints hidden under the package
IonographIonic contamination left by flux and handling
In-circuit (ICT) and flying probeOpens, shorts, orientation and component values
Functional test (FCT)The board working against the customer test procedure

Rework is done in-house, including BGA rework and re-balling verified by X-ray, so a board with one bad joint is repaired rather than rebuilt. The full gate list sits on the PCBA testing and quality assurance page.

Quality inspection stations with AOI and electrical test equipment

Turnkey, partial turnkey and consignment

Three commercial models run on the same lines. In a full turnkey order the Gerber data and BOM are all that is needed — parts are sourced, boards fabricated, assembled, tested and packed. In a partial turnkey order the customer supplies the bare boards and selected components. In consignment assembly the customer supplies the components and everything else is handled here. The turnkey electronics assembly service covers the first two as one purchase.

Component supply is run by the components sourcing team, buying against the whole BOM and holding moisture-sensitive parts in temperature- and humidity-controlled storage; where a part is obsolete or on a long lead, a substitute is proposed before the schedule slips.

Getting a quotation

Send the Gerber set, BOM, pick-and-place data, assembly drawing, quantity and target date. A complete package is quoted within 24 to 48 hours; prototypes come back in 1–3 days and medium volume in 4–10 days, with stencils cut within four hours. Urgent prototype work runs through express prototype assembly and volume orders through low and high volume PCBA; process limits are listed on the capability page and the issued certificates on the certifications page.

Technical Specifications

SMT capacity
Four lines placing 6 million chips per day · 01005 and 0201 packages
Through-hole capacity
Three DIP lines handling 1.6 million pieces per day
Placement accuracy
4 mil (0.1 mm) pitch · single- and double-sided placement
Soldering methods
Reflow, wave and selective soldering · hand insertion and point-to-point wiring
Stencil service
Stencils cut and delivered within four hours
Inspection
Solder paste inspection (SPI), AOI, X-ray and ionograph contamination testing
Test
In-circuit (ICT), flying probe, functional (FCT), burn-in and thermal cycle testing
Rework
BGA rework and re-balling, verified by X-ray
Engineering review
DFM, DFA and DFT checks on the Gerber set, BOM and assembly drawing
Order types
Full turnkey, partial turnkey, consignment and partial consignment
Lead time
Prototype 1–3 days · medium volume 4–10 days
Compliance
ISO 9001:2015 · IATF 16949:2016 · ISO 13485:2016 · UL E354070 · RoHS

Frequently Asked Questions

  • Which PCB assembly services does Hitech Circuits run in-house?

    Seven: express prototype assembly, volume PCBA, printed circuit board assembly services, turnkey assembly, component sourcing, PCBA testing and quality assurance, and box build. PCB fabrication runs in the same group, so a build can start from a bare-board design, a BOM or a complete product.

  • What are the SMT and through-hole assembly capacities?

    Four SMT lines place six million chips per day, handling 01005 and 0201 packages down to 4 mil (0.1 mm) pitch on one or both sides of the board. Three DIP lines place 1.6 million through-hole pieces per day, and every board passes SPI and AOI, with X-ray used where BGA joints sit under the package.

  • What data does Hitech Circuits need before assembly can be quoted?

    The Gerber set, the BOM with manufacturer part numbers, the pick-and-place file, an assembly drawing, the quantity and the required lead time. DFM, DFA and DFT review runs on that package before the first article, so open pads, missing footprints and clearance problems are found on paper rather than on the line.

  • Which tests run before assembled boards ship?

    In-circuit test, flying probe test and functional test against the customer test procedure, plus burn-in, thermal cycling, hi-pot and vibration testing where the application calls for them. Stencils are cut within four hours, prototypes come back in 1–3 days and medium volume in 4–10 days.

Request a customer quote

Free engineering review and quote for PCB manufacturing, PCB assembly, component sourcing and box build.