Menu
Blog

China PCB and PCBA Service

Buying from China is a process question. The price is only meaningful when the review, the test plan and the shipping terms are known.

Hitech Circuits Engineering Desk

Shenzhen, China · PCB fabrication and assembly

2 min read

Published:

Last updated:

Technical review: Process figures checked against our published capability sheet. View capability sheet

You must Know about China PCB fabrication & PCB assembly Services

Quotation and review

Send Gerbers, BOM and assembly notes. A DFM review before tooling is where most avoidable cost is removed.

Build and test

Fabrication, assembly and test may run in one plant or across suppliers; ask which applies and who owns a defect found at test.

Shipment

Agree Incoterms, packing and documentation early. Customs and freight decide the real delivery date as much as the production schedule.

Technical Specifications

Services
PCB manufacturing · assembly · sourcing · box build
Lead times
1–3 days prototypes · 4–10 days mid-volume
Quality gates
IQC · IPQC · QC · QA

Frequently Asked Questions

  • What should be agreed before a first order from China?

    The specification (layer count, material, finish, copper weight), the acceptance standard (for example IPC-A-610 for assembly), the test plan and the shipping terms. Putting them in the purchase order avoids most disputes later.

  • How are quality issues handled after shipment?

    With lot records. If the boards, parts and process data are traceable, a claim can be reviewed against the build file. Without traceability, the discussion becomes an opinion exchange.

← Blog

Related engineering notes

Request a customer quote

Free engineering review and quote for PCB manufacturing, PCB assembly, component sourcing and box build.